Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

OKIsItJustMe

(19,937 posts)
Fri Aug 16, 2013, 08:59 PM Aug 2013

Saudi Arabia’s large-scale renewable energy plan

http://gulfnews.com/business/general/saudi-arabia-s-large-scale-renewable-energy-plan-1.1221040
[font face=Serif][font size=5]Saudi Arabia’s large-scale renewable energy plan[/font]
[font size=4]K.A.CARE targets 500–800 MW of renewable energy projects in introductory round[/font]
By Saifur Rahman Associate Editor
Published: 17:18 August 16, 2013

[font size=3]In 2012, Saudi Arabia unveiled its ambitious renewable energy capacity targets: 25 GW of CSP, 16 GW of solar PV, 9 GW of wind, 3 GW of waste-to-energy, and 1 GW of geothermal by 2032. In February 2013, the country released a White Paper detailing the proposed competitive procurement process of its K.A.CARE programme.

In the introductory bidding round, K.A.CARE is targeting 500–800 MW of renewable energy projects. In the first round, it is targeting 2–3 GW of renewables capacity, of which 1,100 MW will be solar PV and 900 MW CSP, and in the second round, it is targeting 3–4 GW of renewables capacity, of which 1,300 MW will be solar PV and 1,200 MW CSP. The timing for the sequential rounds after the introductory round will be determined based on the length of each preceding round. It is expected that a single procurement round will last between six and 10 months.[/font][/font]
Latest Discussions»Issue Forums»Environment & Energy»Saudi Arabia’s large-scal...