General Discussion
Showing Original Post only (View all)Andrew Kerr- Architect - Here's why the new White House ballroom project is not real. [View all]
Take it for what it's worth. This is floating around on social media.
From the architect.
Here's why the new White House ballroom project is not real. (The demo is obviously real.) Some background - I am a licensed Architect with 20+ years of experience. I have worked on multiple Federal projects with sensitive building programs that required background checks.
1. With a projected size of 90,000sf and a newly revised budget of $300M, the cost per square foot would be $3,333. No building costs anywhere near that. $1,000/sf is astronomical.
2. Let's assume, since we are drawing in the classical, style, that the proportions of the building adhere to the Golden Ratio. A 90,000sf would be a building with a footprint roughly 380' x 235'. Longer than a football field and 1.5x as wide.
2. The building is projected to accommodate 999 people. 15sf/person is required for a banquet area; 20sf/person is pretty comfortable. What you see in the rendering below is closer to 20sf/person. That's only 20,000sf, or a space that is 200'x100'. It's supposed to be a ballroom, so let's be extraordinarily generous and provide 10,000sf for the ballroom support functions, and another 10,000sf for pre-function. Extraordinarily generous. That's STILL only 40,000sf, not even half of the supposed building.
3. There are no drawings for the building. The renderings are poorly coordinated - exterior views do not match the interior views. See below - the White House is 70 feet tall, to the roof. The interior renderings show a room that is roughly 100' x 200', with a ~20 foot ceiling. The exterior renderings show a building footprint of 4.5x that amount.
Those are renderings that could be produced by young staff in a week or two, at most. Nothing else exists.
Sorry for the Facebook link
https://www.facebook.com/photo?fbid=10239930099731751&set