bananas Donating Member (1000+ posts) Send PM | Profile | Ignore Mon May-23-11 04:33 PM
Original message
Siemens Report: Reactor No. 4 spent fuel pool cracked from earthquake (Arnie Gundersen May 22 video)
Edited on Mon May-23-11 04:33 PM by bananas
Video already posted in video forum: http://www.democraticunderground.com/discuss/duboard.php?az=view_all&address=385x585857
http://enenews.com/siemens-reactor-no-4-spent-fuel-pool-cracked-from-earthquake-not-tsunami-fairewinds-video

Siemens Report: Reactor No. 4 spent fuel pool cracked from earthquake (FAIREWINDS VIDEO)
May 23rd, 2011 at 12:23 PM

The Implications of the Fukushima Accident on the World’s Operating Reactors, Fairewinds Associates, May 23, 2011:

Transcript Summary

4:45 in: Meltdown underway at Reactor No. 1 when tsunami hit
4:55 in: Siemens report: Reactor No. 4 spent fuel pool cracked from earthquake, not tsunami

Read more:

Printer Friendly | Permalink |  | Top
AtheistCrusader Donating Member (1000+ posts) Send PM | Profile | Ignore Mon May-23-11 11:47 PM
Response to Original message
1. Yep, that is not good.
We should start looking at scrapping most, if not all of the Mark 1 and probably Mark 2 containments in the US, as ever single one I can think of is near a major fault capable of producing an 8.0+ event.

Perhaps the US counterparts were built to a higher earthquake tolerance, than Japan's, but I highly doubt it.
Printer Friendly | Permalink |  | Top
 
kristopher Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 02:37 AM
Response to Reply #1
2. Is Davis Besse a Mark 1 or Mark 2?

The first cite comes from wiki, and begins with, "Over the years of its operation, the plant has experienced several incidents, none of which have resulted in exposure to dangerous levels of radiation."

That is the "reassuring message that is standard from the industry. The second cite is from the UCS and is from a discussion of the role of regulatory failure in the safe operation of NPPs. It is far, far less reassuring than the claim that "no dangerous levels of radiation" have been released.

PS Did you know that before the NRC released any information on this to the public, they first coordinated for several days with the nuclear industry's lobbying group?

Davis Besse: Incident history

Over the years of its operation, the plant has experienced several incidents, none of which have resulted in exposure to dangerous levels of radiation.


On September 24, 1977, the reactor, running at only 9% power, shut down because of a disruption in the feedwater system.<4> This caused the relief valve for the pressurizer to stick open. As of 2005, the NRC considers this to be the fourth highest ranked safety incident.<5>

Loss of feedwater event
On June 9, 1985, the main feedwater pumps, used to supply water to the reactor steam generators, shut down. A control room operator then attempted to start the auxiliary (emergency) feedwater pumps. These pumps both tripped on overspeed conditions because of operator error. This incident was originally classified an "unusual event" (the lowest classification the NRC uses) but it was later determined that it should have been classified a "site area emergency".<6>

Tornado
On June 24, 1998 the station was struck by an F2 tornado.<7> The plant's switchyard was damaged and access to external power was disabled. The plant's reactor automatically shut down at 8:43 pm and an alert (the next to lowest of four levels of severity) was declared at 9:18 pm. The plant's emergency diesel generators powered critical facility safety systems until external power could be restored.<8><9>


Erosion of the 6-inch-thick (150 mm) carbon steel reactor head, caused by a persistent leak of borated water.



Reactor head hole

In March 2002, plant staff discovered that the boric acid that serves as the reactor coolant had leaked from cracked control rod drive mechanisms directly above the reactor and eaten through more than six inches<10> of the carbon steel reactor pressure vessel head over an area roughly the size of a football (see photo). This significant reactor head wastage left only 3/8 inch of stainless steel cladding holding back the high-pressure (~2500 psi) reactor coolant. A breach would have resulted in a loss-of-coolant accident, in which superheated, superpressurized reactor coolant could have jetted into the reactor's containment building and resulted in emergency safety procedures to protect from core damage or meltdown. Because of the location of the reactor head damage, such a jet of reactor coolant may have damaged adjacent control rod drive mechanisms, hampering or preventing reactor shut-down. As part of the system reviews following the accident, significant safety issues were identified with other critical plant components, including the following: (1) the containment sump that allows the reactor coolant to be reclaimed and reinjected into the reactor; (2) the high pressure injection pumps that would reinject such reclaimed reactor coolant; (3) the emergency diesel generator system; (4) the containment air coolers that would remove heat from the containment building; (5) reactor coolant isolation valves; and (6) the plant's electrical distribution system.<11> Under certain scenarios, a reactor rupture would have resulted in core meltdown and/or breach of containment and release of radioactive material. The resulting corrective operational and system reviews and engineering changes took two years. Repairs and upgrades cost $600 million, and the Davis-Besse reactor was restarted in March 2004.<12> The U.S. Justice Department investigated and penalized the owner of the plant over safety and reporting violations related to the incident. The NRC determined that this incident was the fifth most dangerous nuclear incident in the United States since 1979.<3>

Criminal prosecutions
On January 20, 2006, the owner of Davis-Besse, FirstEnergy Corporation of Akron, Ohio, acknowledged a series of safety violations by former workers, and entered into a deferred prosecution agreement with the U.S. Department of Justice. The deferred prosecution agreement relates to the March 2002 incident (see above). The deferment granted by the NRC were based on letters from Davis-Besse engineers stating that previous inspections were adequate. However, those inspections were not as thorough as the company suggested, and as proved by the material deficiency discovered later. In any case, because FirstEnergy cooperated with investigators on the matter, they were able to avoid more serious penalties. Therefore, the company agreed to pay fines of $23.7 million, with an additional $4.3 million to be contributed to various groups, including the National Park Service, the U.S. Fish and Wildlife Service, Habitat for Humanity, and the University of Toledo as well as to pay some costs related to the federal investigation.
Two former employees and one former contractor were indicted for statements made in multiple documents and one videotape, over several years, for hiding evidence that the reactor pressure vessel was being corroded by boric acid. The maximum penalty for the three is 25 years in prison. The indictment mentions that other employees also provided false information to inspectors, but does not name them.<13><14>

2008 discovery tritium leak
The NRC and Ohio EPA were notified of a tritium leak accidentally discovered during an unrelated fire inspection on October 22, 2008. Preliminary indications suggest radioactive water did not infiltrate groundwater outside plant boundaries<15>

2009 unintentional discharge of firearm
In November 2009, a plant security officer was using the restroom and his firearm discharged while in the holster. The officer sustained a non life threatening wound to his calf. No cause was found for the discharge.<16>

2010 Replacement reactor head problems
After the 2002 incident, Davis-Besse purchased a used replacement head from a mothballed reactor in Midland, Michigan. Davis-Besse operators replaced the original cracked reactor head before restarting in 2004. On March 12, 2010, during a scheduled refueling outage, ultrasonic examinations performed on the control rod drive mechanism nozzles penetrating the reactor vessel closure head identified that two of the nozzles inspected did not meet acceptance criteria. FirstEnergy investigators subsequently found new cracks in 24 of 69 nozzles, including one serious enough to leak boric acid. Root cause analysis is currently underway by the Department of Energy, First Energy, and the NRC to determine the cause of the premature failures.<17> <18> Crack indications required repair prior to returning the vessel head to service. Control rod drive nozzles were repaired using techniques proven at other nuclear facilities. The plant resumed operation in 2010. The existing reactor vessel head is scheduled for replacement in 2011.<19>


Future

The facility's original nuclear operating license expires on April 22, 2017. On August 11, 2006 FirstEnergy Nuclear Operating Company (FENOC) submitted a letter of intent (Adams Accession No. ML062290261).<20> The submission date for the application is August 10, 2010. This initiates a long process that results in an application approval or revocation. Public hearings<21> are a vital part of any application review and information on this process can be found on the U.S. Nuclear Regulatory Commission (NRC) website at NRC.gov. <4>. The site map contains many valuable links <22>
http://en.wikipedia.org/wiki/Davis-Besse_Nuclear_Power_Station#cite_note-21


This page was last modified on 16 March 2011 at 22:20.
Text is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply. See Terms of Use for details.
Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.


That is a sketch of the facts. Below, the is the 28 page policy analysys by the Union of Concerned Scientists puts them into a meaningful framework built around the relationship between the industry and its regulators.

Davis-Besse: One Year Later
Nearly one year ago, on March 6, 2002, workers repairing a cracked control rod drive mechanism (CRDM) nozzle at the Davis-Besse Nuclear Power Station in Ohio discovered a football-sized cavity in the reactor vessel head.1 Their finding is linked to two other discoveries 15 years earlier. On March 13, 1987, workers at Turkey Point Unit 4 in Florida discovered that a small leak of borated water had corroded the reactor vessel head. Their revelation prompted the Nuclear Regulatory Commission (NRC) to require all owners of pressurized water reactors,2including Davis-Besse, to take specific measures to protect plant equipment from boric acid corrosion. On March 24, 1987, the NRC learned that control room operators at the Peach Bottom Atomic Power Station in Pennsylvania had been discovered sleeping while on duty. That revelation prompted the NRC to issue an order on March 31st requiring Peach Bottom Unit 3 to be immediately shut down.3

The three findings spanning 15 years are intertwined. Turkey Point demonstrated that a small amount of boric acid leaking onto the reactor vessel head corrodes carbon steel at a high rate. Had the FirstEnergy Nuclear Operating Company, the owner of Davis-Besse, remembered Turkey Point’s lesson, the serious damage at Davis-Besse would have been averted. Peach Bottom demonstrated that a pervasive safety culture problem creates unacceptable conditions for operating a nuclear power plant. Had NRC remembered either Turkey Point’s or Peach Bottom’s lesson, they would have issued the order they drafted to shut down Davis-Besse. It would have been the first shut down order issued by the agency since the Peach Bottom order. But both FirstEnergy and the NRC forgot the past and relived the wrong event from March 1987 by having yet another reactor vessel head damaged by boric acid corrosion.

Many individuals, from both within and outside the NRC, have accused the agency’s move towards risk- informed decision-making as the reason for its failure to issue the order to shut down Davis-Besse. On the contrary, the NRC’s handling of circumferential cracking of control rod drive mechanism (CRDM) nozzles as reported by the Oconee nuclear plant in February 2001 was a successful demonstration of proper application of risk-informed decision-making with the sole and significant exception of its mistake in not issuing the shut down order for Davis-Besse. But even that mistake, as bad as it was, does not impugn the risk-informed decision-making process for the simple reason that the NRC deviated from that process. Had the NRC adhered to its risk-informed decision-making process, it would have issued the shut down order for Davis-Besse and capped off a stellar example of how this process can and should be used.

In February 2001, the NRC learned of a new aging mechanism, the circumferential cracking of stainless steel CRDM nozzles based on inspection results from Oconee. The NRC properly reacted to this finding by revisiting the nuclear industry’s inspection regime for CRDM nozzles. It determined that the existing inspection regime did not provide adequate assurance that circumferential cracks would be identified and repaired. The NRC did not require all plant owners to immediately address this inspection shortfall, which would have imposed an unnecessary regulatory burden on those plants with low susceptibility for the problem. Nor did the NRC allow all plant owners to address the shortfall at their next regularly scheduled refueling outage, which would have imposed an unnecessary challenge to safety margins at those plants with high susceptibility. Instead, the NRC applied risk-informed decision-making by issuing Bulletin 2001-01 in August 2001 to all owners of pressurized water reactors. This Bulletin required the high susceptible reactors to resolve the inspection shortfall by December 2001, the medium susceptible reactors to resolve the inspection shortfall at their next regularly scheduled outage, and merely collected information from the low susceptible reactors.

Only two reactors with high susceptibility for circumferential cracking of CRDM nozzles did not conform to the inspection requirements...

At this point, the NRC abandoned its risk-informed decision-making process.....


http://www.ucsusa.org/assets/documents/nuclear_power/davis-besse_retrospective_030303db.pdf

http://s259.photobucket.com/albums/hh285/taos-eddy/Energy/Davis%20Besse%20Photos/

















Printer Friendly | Permalink |  | Top
 
Throckmorton Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 10:04 AM
Response to Reply #2
3. Neither, it is a Babcock and Wilcox PWR
Printer Friendly | Permalink |  | Top
 
FBaggins Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 10:28 AM
Response to Reply #3
4. One would think that with all the hundreds of images he's spammed of the reactor head...
...he would know the difference.
Printer Friendly | Permalink |  | Top
 
kristopher Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 11:50 AM
Response to Reply #4
5. It's a literary device called "a rhetorical quesiton"
The post by AC implicitly attempts to place the blame for fukushima's failure on location and design. That is an overly narrow, and consequently false interpretation of the problems related to using nuclear fission to boil water; a point that the history of Davis Besse drives home in spades.
Printer Friendly | Permalink |  | Top
 
FBaggins Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 12:03 PM
Response to Reply #5
6. Nope... it's your standard "spin to something for which I have spam I can use"
Edited on Tue May-24-11 12:04 PM by FBaggins
But thanks for trying.
Printer Friendly | Permalink |  | Top
 
AtheistCrusader Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 12:10 PM
Response to Reply #5
8. Not at all.
I think Fukushima demonstrates the Mark 1 is inadequate for 7.0+ earthquakes, and if ours were built to the same standards, we should tear them down.

It's using experience to form a practical action plan.

We have many faults in the US capable of producing an 8.0+ event, some capable of producing multiples in a short span of time. (NMSZ)
Printer Friendly | Permalink |  | Top
 
Kolesar Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 12:15 PM
Response to Reply #4
9. Flame bait ... eom
Printer Friendly | Permalink |  | Top
 
PamW Donating Member (566 posts) Send PM | Profile | Ignore Sat May-28-11 02:20 PM
Response to Reply #4
16. It's not a "rhetorical device" - it's called IGNORANCE
One would think that with all the hundreds of images he's spammed of the reactor head...
...he would know the difference.
=============================================

Beyond all the pictures of the reactor head, there's another hallmark of kristopher's
manifest ignorance of nuclear power technology:

There's no boric acid in the coolant of a BWR. Only PWRs use the boron in boric acid as
a "reactivity shim". It was boric acid that caused the erosion of the Davis Besse reactor
head. The primary coolant in a PWR is always in the liquid state and dissolved boric acid
can be used for long term reactivity control in lieu of control rods.

In a BWR, the reactor coolant is also the working fluid of the Rankine steam cycle and you
don't want other materials in coolant water that is transitioning from liquid state to gaseous
state, and then condensed back to a liquid again.

To anyone familiar with the technology, the use of boric acid immediately means PWR.

PamW

Printer Friendly | Permalink |  | Top
 
kristopher Donating Member (1000+ posts) Send PM | Profile | Ignore Sun May-29-11 09:38 AM
Response to Reply #16
17. Nno, it is a "rhetorical question" nnot a "rhetorical device" annd it is...
Edited on Sun May-29-11 09:40 AM by kristopher
used to show the fallacy of data trimming. The post by AC implicitly attempts to place the blame for fukushima's failure on location and design. That is an overly narrow, and consequently false interpretation of the problems related to using nuclear fission to boil water; a point that the history of Davis Besse drives home in spades.

http://www.democraticunderground.com/discuss/duboard.php?az=view_all&address=115x295779#296496


Printer Friendly | Permalink |  | Top
 
AtheistCrusader Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 12:08 PM
Response to Reply #2
7. If an earthquake had struck while that reactor head was eroded, I think it's fair
to assume the pressure vessel would have failed.

Can we expect the containment to fail though? The PWR are 3 mile island clearly faired better than the BWR's at Fukushima. (Granted the 'trigger' to fail was different)
Printer Friendly | Permalink |  | Top
 
kristopher Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 04:33 PM
Response to Reply #7
10. Or a tornado...
The identification of specific failures as a guide for the future is useless unless it is part of a larger examination about why such failures find their way into the system. Did you read the full policy paper by the UCS quoted at the bottom of post 2? It address one of the aspects of that question.
Printer Friendly | Permalink |  | Top
 
AtheistCrusader Donating Member (1000+ posts) Send PM | Profile | Ignore Tue May-24-11 05:40 PM
Response to Reply #10
11. Having trouble picturing how a tornado would impact it.
Worst case, takes out the switchyard, and somehow, all of the backup power systems, so there is no cooling. Then the RPV would fail from overheat/pressure. Containment would still be fine.

If a tornado could actually tear down the containment, the reactor would be the last of our worries.

I'll read the policy paper when I get home.
Printer Friendly | Permalink |  | Top
 
Fledermaus Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-25-11 03:02 AM
Response to Reply #11
12. What would a direct hit do to the generators? Are they hardened?
Edited on Wed May-25-11 03:08 AM by Fledermaus
I don't know. How long do the batteries work 4-6 hours?

Printer Friendly | Permalink |  | Top
 
FBaggins Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-25-11 05:03 AM
Response to Reply #12
13. If they're in the basement of the generator building... it wouldn't do much.
How long do the batteries work 4-6 hours?

Remember that the problem at Fukushima wasn't just that they lost power and all backups... it was that there was no possiblw way to restore power because an earthquake and tsunami had knocked out plants and power lines for that entire part of the country.

Tornados don't do that. They take one car/home/town and leave the one beside it virtually untouched.

Kris' favorite reactor was hit by a tornado a little over a decade ago.
Printer Friendly | Permalink |  | Top
 
kristopher Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-25-11 10:51 PM
Response to Reply #11
14. How about that NRC, huh?
Why do you think they worked with the nuclear industry's lobbying group for several days before they released any information on Davis Besse to the public?
Printer Friendly | Permalink |  | Top
 
kristopher Donating Member (1000+ posts) Send PM | Profile | Ignore Wed May-25-11 11:59 PM
Response to Reply #14
15. Kick
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Thu May 02nd 2024, 08:06 PM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Topic Forums » Environment/Energy Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC