Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

When the time comes to hang Saddam

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Archives » General Discussion: Presidential (Through Nov 2009) Donate to DU
 
LuckyTheDog Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Nov-06-06 03:41 PM
Original message
When the time comes to hang Saddam
My prediction:

When the time to hang Saddam comes a long, Halliburton will sell us the rope for $5,000. After that, we'll hand the rope over to the Iraqi government and it'll be stolen.

Printer Friendly | Permalink |  | Top
gratuitous Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Nov-06-06 03:43 PM
Response to Original message
1. And then Donald Rumsfeld will say "Gracious!"
I wonder if Mr. Rumsfeld will attend the execution of his former business partner?
Printer Friendly | Permalink |  | Top
 
neoblues Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Nov-06-06 05:01 PM
Response to Original message
2. Rope charge, indeed...

Halliburtion/K.B.R. Corporation Bill for Hanging Services Provided...

Special "Hanging Rope........... $50,000/ft (per foot)(x200,000 ft)
(excess rope used for practice, testing, spare in case of failure and advance preparation for future hangings; price includes charges for development project to design such a special, superior, hair/beard resistant rope)
--Total Rope Cost...............$10,000,000,000

Book on tying knots............. $12,332

Video on tying Hangman Knot..... $22,110

Rubber Handled Hammer........... $5,999

Stainless Steel Nails........... $7,728

Imported U.S. Lumber............ $25,550

Instructions to Build Gallows... $93,000

Video on Building Gallows....... $144,441

Book of Hanging Jokes........... $1,200

Translation of Hanging Jokes.... $119,900

Self-Help Psychology Books...... $9,706ea (x48)
(for involved U.S. personnel: psychologists, materiel transport drivers, gallows builder/contractors, knot tying personnel, joke translators and anyone who had anything to do with assisting the IRAQI personnel in performance of hanging associated duties)
--Total Self-Help Cost.......... $465,888

Shipping........................ $750,000

Contract Labor/Construction..... $881,998

Transportation.................. $95,799

Service Fee..................... $220,000

Export Licensing................ $75,000

Import Tariff................... $111,111
(collected on behalf of the government of IRAQ (wink, wink, nod, nod))

Black Woolen Hood............... $3,212

Grey/Black Striped Pant/Shirt... $9,051

Leather House Shoes............. $1,909

Grey Socks...................... $880ea (x2)
--Total Sock Cost............... $1,760

Grey Carbon-Fiber Boxer Shorts.. $18,221/pair (x1 pair)
(Carbon-Fiber/Carbon Impregnated = Soil Resistant/Odor Reducing)

Special "Hanging" Video Camera.. $7,222,299,303
(Capable of videotaping in color through 6ft of concrete/rock; corporate developmental costs included--except rush development fee. Required because the hanging will be performed in a small blast-bunker with 5 foot thick concrete walls, and there was insufficient room for proper camera placement (and it's against IRAQI tradition and Muslim religious laws to videotape a hanging-execution, but GWB wanted a video of the event))
Copies of Videos................ $5,000ea (x200)
--Total Copies Cost............. $1,000,000
Mailing Fees.................... $50ea (x200)
--Total Mailing Cost............ $10,000
Handling Fees................... $10ea (x200)
--Total Handling Cost........... $2,000

"Rush" Camera Development Fee... $2,000,000,000

Miscellaneous Costs/Charges.....$76,180,800,002
Note: According to U.S. Contractual Agreement With K.B.R. Inc., K.B.R. Inc. is not legally required to provide any evidence of the actual costs, materials, charges or fee schedules used, either at the time of service or in perpetuity, while the U.S. Treasury is required by law to indemnify K.B.R. Inc. immediately upon receipt of itemized (to K.B.R.'s satisfaction) Bill. All such payments or indemnifications shall be considered final and non-refundable. K.B.R. Inc. makes no guarantee, either express or written of, for or about any of it's provided products or services. Further, no witholdings may be made by the Treasure for any purpose, including obtaining Federal Tax obligations or any other claim as this has been expressly forbidden and written into U.S. Tax Law by Congress on behalf of K.B.R. Inc.

Bill Preparation Fee............ $154,303
Postage Costs................... $19

Total: Well Over $96 BILLION DOLLARS... Just to assist the IRAQI's in hanging Saddam (and get private home movies for GWB).

Oops. I forgot food, clothing, housing, recreation, party favors and supplies, video transmission costs, expert technical specialist contractor fees... and on, and on, and on.



Somehow, I doubt that I'm exaggerating... much.

Printer Friendly | Permalink |  | Top
 
Infinite Hope Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Nov-06-06 06:00 PM
Response to Reply #2
4. Where are the photo development charges...
Edited on Mon Nov-06-06 06:02 PM by Infinite Hope
for the pre-hanging sex pyramid?
Printer Friendly | Permalink |  | Top
 
Bullshot Donating Member (807 posts) Send PM | Profile | Ignore Mon Nov-06-06 08:09 PM
Response to Reply #2
5. And Condi will say,
"Gee, we never could have seen that coming."
Printer Friendly | Permalink |  | Top
 
Infinite Hope Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Nov-06-06 05:58 PM
Response to Original message
3. LMAO...K&R
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Thu Apr 25th 2024, 10:56 PM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Archives » General Discussion: Presidential (Through Nov 2009) Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC