You are viewing an obsolete version of the DU website which is no longer supported by the Administrators. Visit The New DU.
Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

BP's Gulf Oil Well Leak May Take Months to Shut After Rig Sinks [View All]

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Topic Forums » Environment/Energy Donate to DU
joshcryer Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Apr-25-10 06:19 PM
Original message
BP's Gulf Oil Well Leak May Take Months to Shut After Rig Sinks
Advertisements [?]
April 25 (Bloomberg) -- BP Plc said it may take at least two or three months to drill a relief well to stop a 1,000- barrel-a-day oil leak into the Gulf of Mexico after a drilling rig caught fire and sank last week. The company is also trying to shut the well's valve with robots.

The oil spill, which covers 600 square miles (1,554 square kilometers), won't reach a shoreline within the next three days, said Charlie Henry, a scientific support coordinator with the National Oceanic and Atmospheric Administration during a teleconference today. Henry said it isn't possible to give estimates beyond three days.

Swiss drilling contractor, Transocean Ltd., is shipping in two rigs to stop the leak with the first scheduled to arrive tomorrow and the second May 2. The companies may need a relief well if the blowout valve isn't activated. A relief well would intercept the leakage and inject a heavy fluid to prevent oil or gas from escaping, London-based exploration company BP said in a separate statement. That would allow the well to be sealed.

"The relief well as described could take several months," Doug Suttles, BP's chief operating officer of exploration and production, said on the teleconference.

The response group, including BP and Transocean, began using remote operated vehicles at 8 a.m. local time today to try to switch on the blowout value, part of a 50-feet tall and 18- feet wide housing on the sea floor. It may take 24 to 36 hours to complete the work, Suttles said.


http://www.sfgate.com/cgi-bin/article.cgi?f=/g/a/2010/04/25/bloomberg1376-L1GEGS07SXKX-1.DTL

---

FYI, 1,000 oil barrels = 42,000 gallons.

This is a very bad disaster.
Printer Friendly | Permalink |  | Top
 

Home » Discuss » Topic Forums » Environment/Energy Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC