You are viewing an obsolete version of the DU website which is no longer supported by the Administrators. Visit The New DU.
Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

Reply #37: C4 Coating On Concrete Core Rebar Causes Complete Fracturing [View All]

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Topic Forums » September 11 Donate to DU
Christophera Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Apr-03-06 10:35 PM
Response to Reply #2
37. C4 Coating On Concrete Core Rebar Causes Complete Fracturing
not to mention free fall along with C4 in the corrugations of the floor panels that pulverizes the entire contents of every floor.

http://algoxy.com/psych/9-11scenario.html

I've done the math on the basic delays. 75 milliseconds delay (generally) for the floor detonation sequence and 300 milliseconds for the concrete core core per every 4 floors.

At the above link, free fall, pulverization, backwards fall sequence and flight 93 are explained.
Printer Friendly | Permalink |  | Top
 

Home » Discuss » Topic Forums » September 11 Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC